The construction of the JFYM50hydraulic climbing form system with integral lift-up is adopted.
国家大剧院歌剧院舞台通道为超高大筒体结构,采用JFYM50整体提升液压爬模体系施工。
Try to notice how climbing technique changes as fatigue builds, and really work to maintain good climbing form no matter what.
试着感觉一下在疲劳的时候,攀岩技术是如何变形的,然后无论如何尽力保持好的攀爬状态。
It is simple and convenient and of speediness, and good quality control using the variable cross-section climbing form for chimney construction.
用变截面提模施工烟囱,简单易行,设备简便,速度快,质量有保证。
应用推荐