·2,447,543篇论文数据,部分数据来源于NoteExpress
Based on the results, the total 20 production wells should be classified into 3 types, the wells are of that actual production capacity exceed, under, and match with the designed project.
根据研究结果,把该区20口生产井按实际生产能力与设计方案的关系分成了3类:超过设计方案的井、达不到设计要求的井和与设计相符的井。
youdao
应用推荐
模块上移
模块下移
不移动