In civil engineering construction is much bigger in both cost and time than design and planning.
在土木工程建设中,施工所用的时间和费用都远比在设计和规划中花费的多。
The quality control point is the common method of the quality prior-control during civil engineering construction.
质量控制点是土木工程施工中对质量进行事前控制的常用方法。
Soil percolation and seepage control is an extremely important subject in soil mechanics and civil engineering construction.
土的渗流和渗流控制是土力学和土木工程建设中的一项极其重要的课题。
应用推荐