The ground area was also checked with dye-penetrant to ensure that no crack tip remained.
打磨区也用着色渗透剂进行了检查,以便确保无裂纹尖端留存。
The runners of 6 operated generating unit of Ertan Hydro Station have been checked and no crack on the primary weld of the field welding position is observed.
二滩水电站已全部投运的6台机转轮经停机检查,现场焊接的主焊缝无裂纹。
Stability of the crack should be checked by the method of fracture mechanics, which should be a supplemental stability condition of the gravity DAMS.
坝踵裂缝扩展是重力坝破坏的开始。应该用断裂力学方法校核坝踵裂缝的稳定性,并以此作为重力坝稳定的补充条件。
应用推荐