Charge Pump Elevator 电荷泵升压电路
In Charge of elevator cable development, Includes Design, new material, process and DOE.
负责电梯电缆开发,包括设计,新材料、工艺及实验设计。
Meanwhile, charge pump elevator in powered-off state is reversely cut off to prevent energy leakage to ground.
同时,掉电后的电荷泵升压电路反向截至能防止能量从存储电容泻放回到地。
The model between power efficiency and clock overlapping for charge pump elevator is established, and the optimized clock control strategy to achieve the highest power efficiency is proposed.
建立了电荷泵电路的效率与时钟控制信号的交叠量模型,提出了能获得最高效率的最优时钟控制策略。
应用推荐