Due to the pit was so deep, so no fit for opening and train transport. winter coming, they will move out locos from open cast coal mine, change lorry.
基于1个网页-相关网页
However, the design method of lorry bogie spring is unsuitable to this change.
然而,车辆弹簧的设计方法有些难以适应这种变化速度。
A procedure information management system for lorry deport repair is designed to trace the checking status of lorry, and dispatch and change fittings to ensure work time and work procedure.
为货车车辆段修设计了过程化信息管理系统,能够对各车辆的检修状态进行跟踪,及时配送检修及互换配件,保证检修作业时间和作业进度。
应用推荐