While Halliburton had finished cementing the casing area outside the pipe, it had not yet been able to set a cement plug to block the pipe before the explosion.
尽管哈里·伯顿公司已经结束了管道外部套管区域的水泥浇铸,却未能在爆炸发生前设置一个水泥封井装置把管道封起来。
This paper discussed the main reason of casing damage for oil-water Wells in block Hu 5.
讨论了胡状集胡五块油水井套管损坏的主要原因。
应用推荐