This article assumes that a project team that wants to estimate with use case points writes their use cases at goal levels.
本文假设有一个项目团队想要使用用例点来估计,这些用例点书写了目标层次上的用例。
The estimate includes a range similar to the traditional "best case, worst case and most likely case" estimates.
估算与传统的“最好情况,最坏情况以及最可能的情况”估算有些相似。
This installment discusses how to estimate for emergent design, and how to make a convincing case for repaying technical debt.
这一期将讨论如何评估紧急设计,以及如何制定一个令人信服的偿还技术债务方案。
应用推荐