Failure of one of two cooling systems in August set off equipment shutdowns. In July, a faulty radio link forced an unmanned cargo ship to delay docking for two days.
八月份时,两个制冷系统中的一个发生的故障引发了设备关机。
Grasping the temperature distribution of cargo tank during the pre-cooling is the basis of making a safe and economic pre-cooling plan.
掌握液舱温度在预冷过程中的变化规律是制定安全经济的预冷方案的基础。
应用推荐