Putalllineplates and U-shapedfillingblocks of the unitbeside the engine, so they can be used conveniently later. The line plates shall be fitted with adjustablebolts.
Intensely radioactive water from reactor Unit 2 is filling a nearby tunnel faster than workers can empty it, and radioactive levels of seawater near the plant increased sixfold following an aftershock on Saturday.