That is why Mr Obama must soon set out his own grand plan, along the lines so nearly adopted at Camp David in 2000 and elaborated as the "Clinton parameters" shortly after the talks failed.
这就是为什么奥巴马在会谈失败以后,立即提出了自己的宏伟蓝图,以及与2000年戴维营会谈非常接近条件,这些条件如“克林顿参数”般事无巨细。
These are good places to plan forest-related activities – a park, a zoo, a camp.
那里可能是规划森林相关活动的适宜场所,如公园、动物园、营地等。
Scrum and XP are squarely in the Agile sector while RUP and Evo are more in the traditional (plan-driven) iterative camp.
Scrum以及敏捷部分涉及的XP,还有更多偏重于传统的(计划驱动的)迭代方法rup和evo。
应用推荐