According to the tensile deformation and the impact with the seabed of cable for the platform in the deep water, the lumped mass method was adopted to set up the cable equation.
考虑深海平台系缆的拉伸形变及与海底的撞击力,采用集中质量法,建立了系缆方程组。
In shallow water, such as the water depth is less than 200 meters of sea cable laying adopted, and are used in deep-sea deployment.
在浅海,如水深小于200米的海域缆线采用埋设,而在深海则采用敷设。
应用推荐