Based on the practical condition of Hong-feng-lake grand bridge, the methods for cable force control, main beam's elevation control, main beam 's stress control and the measures for them are also introduced.
结合红枫湖特大桥施工控制的实施,介绍了索力控制、标高控制、主梁应力控制的方法和采取的措施。
参考来源 - 红枫湖特大桥施工控制·2,447,543篇论文数据,部分数据来源于NoteExpress
应用推荐