This paper presents a design example of using a cable crane for lifting and erecting an access bridge for the right bank spillway tunnel for the Lubuge Hydropower Station.
这里介绍了应用于鲁布革右岸泄洪洞交通桥吊装的缆索起重机的设计实例。
Reasons for crane cable reel rebuilding are given with the new design, calculation of reel transmitting and the strength of output. The result of rebuilding is got.
电缆卷筒的改造原因,新卷筒的设计,卷筒传动及输出轴强度的计算,改造后的效果评价。
The design, calculation and construction method for cable crane system, main pylon system, fasten and hang system and anchor system are introduced respectively in this paper.
分别介绍了该缆索吊的缆索系统、主塔架系统、扣挂系统和锚固系统的设计、计算及施工方法。
应用推荐