Abstract: By the engineering case, the paper introduced the selection of drill ship & equipment, drill ship assembling & anchoring positioning, drilling technology & calculation method of kelly overstand and footage per run for river drilling of bridge foundation investigation in flood season. The attentions on river drilling construction were emphasized.
基于1个网页-相关网页
应用推荐