Shifting time from anchorage to unloading berth, time lost due to berthing operations and preparations by the vessel to berth, and time taken for completion of pratique at anchorage or after berthing.
从锚地到卸货泊位的移泊时间,由于靠泊操作和船只准备靠泊而损失的时间以及在锚地或靠泊后为办完入港许可而花费的时间。
By the way, I 'm informed to shift my ship to the anchorage and wait for a free berth.
顺便说一下,我接到通知,要把船移到锚地等候空泊位。
By thermal comfort index PMV, the thermal comfort ratio of the specific profile at each berth is only 42%.
采用人体热舒适性指标PM V得出特征断面上各铺位上达到热舒适标准的测试点仅为42%。
应用推荐