The European "construction" is a half-built project.
欧盟的建设是个只完成了一半的工程。
Baishi hydropower station, loaned by OECF in Japan, is a newly built project.
白石水电站是利用日本海外经济协力基金(OECF)贷款的新建项目。
Baoying Pump Station was the first-built project in Southto-North Water Transfer Project.
宝应泵站是南水北调东线第一个开工建设的项目,对以后其他泵站的建设起着示范的作用。
应用推荐