Fort building is Wong, lime, fine sand mixing, layer by layer filling compaction, very strong.
炮台建筑采用黄泥、石灰、细砂拌和,逐层填筑夯实,非常坚固。
The phosphogypsum can be calcined into quality building plaster via neutralized with lime, ball milled or water washed, ball milling pretreated.
磷石膏经石灰中和、球磨或水洗、球磨预处理,可煅烧成优等品建筑石膏。
By the collapse accident treatment on a building, the treatment principle and effect of lime pile underpinning is analysed.
通过对某一建筑湿陷事故的处理,分析了石灰桩基础托换技术在处理地基湿陷事故中的机理及效果。
应用推荐