以上来源于: WordNet
Items can only be relatively aligned to anchor items that appear before them in the build order.
项目只能与在构建顺序中出现在它们之前的锚定项相对对齐。
More often than not, you will require a different script build order based on script dependencies.
往往,您需要一个不同的基于脚本依赖性的构建次序。
Relative alignment is more difficult to work with because it depends upon the build order of the form.
相对对齐相对较难,原因是它取决于表单的构建顺序。
It will wash away and so you got to pick the right materials in order to build a bridge.
它可能会被水冲走,之后人们就会选择更好的材料,以造出了更为坚固的桥
Before I do that though, let me try and give you an analogy to keep this in mind of why we want to basically build these abstractions and what we need in order to have them work together.
在我们看例子之前请让我打个比方,以便你们能记住我们,为什么要建立这些抽象,以及要使它们协调工作,我们需要做些什么。
In order to do that, we build a project.
为此,创建了一个项目。
应用推荐