Research and application of advanced construction monitoring and supervising techniques guarantee the bridge to have good line shape and high construction preciseness.
研究采用先进的施工监控、监测技术,保证了桥梁良好的线形和较高的施工精度。
The assessment of the adaptability of pontoon bridge equipment in high velocity current is an important part of the strength of crossing engineering guarantee.
舟桥装备的高流速适应性评价是评估装备渡河工程保障能力的重要组成部分。
Manage Warehouse Operator, Incoming material Operator, Weight Bridge Operator, Auto Spare Part Buyer, organize direct materials and indirect materials to guarantee normal operation.
对库管、收料员、地磅员及汽车配采购件员的工作进行管理,对生产材料和非生产性物料进行组织,保证生产正常。
应用推荐