Transverse displacement of bridge abutment and fill slide of approach happened during the construction period of Shanghai Huqingping Freeway.
上海沪青平高速公路施工期间,发生桥台横向位移和引道填土滑坡的情况。
The article introduces the bridge abutments function and types, and discusses abutment construction and installation measures and the attentions during the usage.
文章简述了桥梁支座的作用、类型,并对支座的施工安装方法、支座使用过程中应注意的事项等进行了探讨。
In bridge construction, the major task of survey lies in the accurate setting out of abutment location, pier location, and the components of the crossing structure.
在桥梁建设中,测量工作的主要任务是精确地放样桥墩桥台的位置和跨越结构的各个部分。
应用推荐