This paper introduces the application of the backfillgroutingtechniqueto block up the branchtunnel, the correspondingtechnology, techniquerequest and resultevaluation are given.
The Rail Accident Investigation Branch (RAIB) said the broken sections were part of an auger drill that had "penetrated the tunnel lining before falling on to the track".