Barcelona's Cloud 9 loosely conceived of a vehicle that is both light and flexible-a bubble with soft skin and photovoltaic dots that generate energy.
巴塞罗那的“9号云”设想出一种既轻盈又灵活的车辆——一个外表柔软,利用光电小突点发电的泡泡机。
Flexible project management requires a balance of both the left and right brain, hard and soft skills.
敏捷项目管理需要在左/右大脑,硬/软技能间作出权衡。
应用推荐