·2,447,543篇论文数据,部分数据来源于NoteExpress
Lift BOP stack and replace wellhead connector AX ring.
吊起防喷器组并更换连接器AX密封圈。
youdao
Run the guide lines into the guide posts on the BOP stack.
将导向绳装进防喷器组上的导向柱内。
Hoist the BOP stack with the hook and have an overall check.
用钻机大钩提起防喷器组并进行全面检查。
After that, the BOP is removed and the Xmas Tree stack is installed in its place.
FORBES: McMoRan Update From Enercom Oil & Gas Conference
应用推荐
模块上移
模块下移
不移动