hydraulic boiler test 锅炉水压试验
auxiliary boiler test [动力] 辅锅炉试验
main boiler test [动力] 主锅炉试验
exhaust heat boiler test [动力] 废气锅炉试验
boiler test pump 锅炉试验泵
power plant boiler test 电站锅炉测试
boiler acceptance test 锅炉验收试验
boiler efficiency test 锅炉热效率试验
Boiler gross efficiency is obtained after corrections of environment temperature, feedwater temperature and coal quality to boiler test efficiency.
对锅炉测试效率进行了环境温度、给水温度及煤种修正,得到锅炉毛效率。
After this test we can calculate: It takes 40 minutes to braise a chook by a normal boiler, but it only needs 15 minutes by the flameout reboiler.
通过这个实验我们来算一算:采用普通锅炖鸡需要花费40分钟,而熄火再煮锅只需15分钟。
Automatic controller test for auxiliary boiler.
辅锅炉自动控制装置试验。
应用推荐