... 闭塞分区: block section 胆管闭塞: occlusion of bile duct 闭塞振荡器: blocking oscillator ...
基于1个网页-相关网页
Laying signal machine、definiting train tracking interval and checking the length of block section to satisfy braking distances, all of these should be based on traction calculation.
为了布置区间通过信号机、确定列车追踪间隔时间并检查闭塞分区长度是否与计算的制动距离相符,必须进行牵引计算。
参考来源 - 牵引计算在高速铁路闭塞分区设计中的应用研究·2,447,543篇论文数据,部分数据来源于NoteExpress
Zhang Zhuo, boarded the Block section. Two Poems.
张濯,登上元进士第。诗二首。
When the mining area enter the end stage, the optimization design of final block section and uphill pillar recovery are important.
采区进入收作阶段,最后块段与上山煤柱回收的优化设计、合理开采尤为重要。
In the progress of constructed high speed railway the design of choosing lines and the design of automatic block section are the first and most things.
在新建高速铁路的过程中,首先要解决的是选线设计和闭塞分区的设计,列车牵引计算是划分自动闭塞分区的基础。
应用推荐