Those deep water rigs use an enormous amount of diesel fuel to turn the drillbit, and also resist the force that is turning the drillbit and would otherwise force the platform to start turning in the opposite direction.
Drilling under Plan A will stop this weekend once the drillbit reaches 1, 247 feet (380 meters), then the drill will receive scheduled maintenance before resuming early next week, engineer Rene Aguilar said.