The definition of a benchmark control problem for seismically excited nonlinear high-rise buildings is presented. Besides the seventeen evaluation criteria specifiedin thebenchmark problem,twoadditionalcriteria todescribethe performance of the controlled system are considered.
2.介绍了地震激励高层建筑非线性反应控制基准问题的定义。
参考来源 - 地震、风激励作用下高层建筑振动控制的研究·2,447,543篇论文数据,部分数据来源于NoteExpress
Finally, we use some benchmark problem in TSPLIB to verify the performance of the modified genetic algorithms.
最后,针对所提出的改进算法,本文选择TSPLIB中典型的TSP问题实例,进行实际验证。
Classic scheduling benchmark problem test shows:the self-adaptive measure can efficiently keep current populations diversity, can use very small population size; shortest idle time .
针对作业车间调度问题,提出了最小化空闲时间的处理过程及其变异算子,设计了一种自适应遗传算法。
The benchmark problem for GT-MHR plutonium burner accidents is a part of the IAEA Coordinated Research Program(CRP) on "heat transport and afterheat removal for GCR under accident conditions".
气体透平氦气模块堆(GT-MHR)标准题是国际原子能机构(IAEA)关于“高温气冷堆在事故工况下的热传输和余热载出”问题的合作研究计划(CRP)的一部分。
应用推荐