During an implementation of an identity resolution solution there are many steps before getting to the ingestion process design, so you could potentially have less time to think about it.
在实现身份解析解决方案期间,在开始摄入过程设计之前,有很多步骤需要执行,因此可供您考虑的时间可能并不多。
These artifacts must always be at hand before, during and after a project, because they offer a primary point of reference for planning, design, implementation, maintenance, and optimization methods.
在项目开始之前、进行期间以及结束之后,这些工件必须始终记在心里,因为它们提供了规划、设计、实施、维护及优化方法参考的要点。
This paper introduces the design scheme of precipitator retrofit project of thermal power plant, discusses the methods and bases of rational optimization before and during retrofit.
介绍了火力发电厂除尘器改造工程的设计方案,论述了工程改造前及改造中如何做到合理优化的方法及依据。
应用推荐