Large bearing platform above the water is one of difficult points in the construction of Jiajiang bridge.
夹江大桥主墩的水中大型承台是施工的难点之一。
The massive concrete proportion design for main pier bearing platform of Sifangtai Bridge in winter construction was mainly introduced.
本文重点介绍了四方台大桥主墩承台大体积混凝土冬季施工配比的设计。
Based on the case of the large bearing platform of Jianning Bridge of Zhuzhou, cement casting and temperature controlling techniques are introduced.
以株洲建宁大桥主体墩承台施工为背景,介绍大体积混凝土施工的浇注工艺及温度控制措施。
应用推荐