The local PLC is applied to control the BCHP when the system integration and pipeline design are finished.
在完成BCHP系统管路设计的基础上,利用基于现场的PLC来进行控制。
The way and step for this kind of energy supply system can be extended for the earlier laying and designing stage of BCHP.
这种能源系统的分析配置方法和步骤可以推广到BCHP的前期规划设计阶段。
Analyses the economic effects of the building cooling heating and power (BCHP)and compares them with those of general air conditioning systems.
分析了楼宇级冷热电联产(BCHP)方案的经济性,并与目前常用的几种空调机房方案进行了比较。
应用推荐