The new plant will consist of three units, each producing about 430 MW. The power plant is scheduled to go on line in early 2011. ABB's scope of supply includes electrical components for the auxiliary power supply systems, a 380-kilovolt (kV) high-voltage substation and the switchgear building. ABB will also supply 380-kV cables, transformers, generator breakers, medium- and low-voltage switchgear, emergency-power diesel sets, batteries and communication systems, as well as engineering, installation, commissioning and training.