As early as the 50s in the last century, batter pile has been applied to construction, to resist horizontal loads.
早在上世纪50年代,倾斜桩就已经应用于工程,来抵抗水平荷载。
In order to avoid waste, the small-angle batter pile which meets the regulatory requirements often continue to be used.
为了避免浪费,在满足规范要求范围内的小角度倾斜桩往往继续使用。
应用推荐