Pilot test confirmed the ore dressing flowsheet, regime and index of the batch test.
扩大连续试验验证了实验室试验的工艺流程、制度和选矿指标。
The process parameters provided by the batch test have been proved by the continuous bench-scale leaching test.
小型试验提供的浸出工艺参数,以连续浸出台架试验进行了验证。
The mechanism of ozonation disintegration for activated sludge reduction was studied by batch test, and the dissolving laws of some indexes were analyzed.
通过静态试验的方法了解了臭氧破解活性污泥的机理,并从理论上分析了各指标溶出规律。
应用推荐