In indirect method, the basis of calculation is net income, and then a lot of items should BE adjusted.
在间接法下,计算的基础是净收益,在此基础上要对一系列的项目进行调整。
The exploration prospect of natural gas for these basins was evaluated and compared on the basis of calculation.
在此基础上,对我国主要含气盆地天然气的勘探前景进行了对比和评价。
On the basis of calculation results, the author submits corrective proposals to the indices of "Design Standard of Urban Road Planning".
根据计算结果,作者对《城市道路规划设计规范》的建议指标提出了修改建议。
应用推荐