Taking Zhai Zhen coal mine of Xinwen mining industry group as the example, the last has researched the implementation of the coal mine human-basis management model in this mine.
最后,以新汶矿业集团翟镇煤矿为例,对煤矿人本管理模式在该矿的实施作了研究。
The systematic design of communication management system is completed and realized finally on this basis of the model.
在建立的模型基础上,完成了通信管理系统的系统设计并且实现了这个系统。
On the condition of establishing material's deterioration model, this method can be used as the basis of bridge life-long management system and provides foundation for bridge's maintenance.
在建立材料性能劣化模型的情况下,该种方法可以作为桥梁生命周期成本管理系统的基础,为桥梁养护、管理优化提供依据。
应用推荐