Each addition to the development case should be balanced with the expected benefits in terms of time saving, quality gain, or providing a basis for project estimation, planning, and scope management.
向开发案例中添加的每一项元素都应该根据期望的效益进行平衡,您需要考虑的方面包括:时间节省、质量获得,或为项目评估、计划和范围管理提供的基础。
Since they are working on a contingency basis, they stand to gain a substantial portion of any damages.
由于这项工作是在应急基础上进行,那么原告就一定会受到大量损失。
Credit-default swaps on BHP jumped 15 basis points to 87.5 basis points as of 10:14 a.m. in Sydney, the biggest gain since May 7, according to prices from Nomura Holdings Inc. and CMA.
另据野村控股公司和CMA的价格统计,截至悉尼时间上午9点3分,必和必拓的信用违约掉期上涨12个基点,为84个基点,创下5月7日以来最大涨幅。
应用推荐