Based on these problems to play the greatest landscape effect.
基于解决这些问题发挥景观的最大效应。
Based on these problems, the fifth part of the article put forward their own solutions.
以此为前提,在文章的第五部分提出解决方案。
Based on these problems, this paper expounds the construction stage of cost control method.
针对于这些问题,阐述了施工阶段成本控制的方法。
应用推荐