Based on reliability analysis of natural gas boosting system and taking the volume, weight, and total cost as the constraints, the system reliability was optimized.
以天然气增压系统的可靠性分析为基础,在体积、重量和总费用的约束条件下,通过优化设计使整个系统的可靠度最高。
This paper presents a control strategy of demand pulled spare parts inventory. It establishes a spare part demand prognosticating model based on reliability analysis.
提出了“需求拉动式”航空器材库存控制模式,建立了基于可靠性分析的航空器材需求预测模型。
Through the back-analysis of a computing example, the design optimization of pile-strut bracing structure of deep foundation pit is presented based on reliability analysis.
为了进行支护结构的可靠性设计,探讨了随机变量对支护结构设计的影响,并给出了进行支护结构计算的实例。
应用推荐