Based on the structural characteristics and site conditions, low level spread assembly and pulling bar group relay lifting method is adopted to install the shell.
施工中针对网壳结构特点及现场施工条件,采用低空外扩拼装、拔杆群接力提升的方法完成了安装。
The solution is to simply remove deployed children from the execution group, then redeploy the BAR file.
解决方法是,直接将部署的子项从执行组删除,然后重新部署 BAR 文件。
Among them are a modernist bar by Mr Lalanne and a group of mirrors by his widow.
其中有拉兰内先生的现代主义餐桌和拉兰内夫人的一组镜子。
应用推荐