foreground-background scheduling 前台 ; 前后台调度
foreground background scheduling 前后台调度
background job scheduling 背景计划日程
Background Data Scheduling 后台数据调度
Background Transfer Scheduling 背景转移调度
Scheduling of background jobs 后台作业的调度
One issue that was found after the release of MacRuby 0.6 seems to cause problems with scheduling a block to run on the main thread from a background thread.
MacRuby 0.6发布之后,用户发现了一个问题,在运行某代码段的时候, 从后台线程切换到主线程会导致程序崩溃。
Under this kind of background, we research on dynamic scheduling system research of manufacture grid.
本文正是在这种背景下开始了制造网格环境下动态调度系统的研究。
With hard real time application as the application background, this paper presents the design and implementation of scheduling APIs which support scheduling strategy.
并面向强实时应用的需求,设计和实现了基于调度策略的调度API接口。
应用推荐