The process of assembling flanged components such as pressure-control equipment.
组合带法兰部件(如压力控制设备)的过程。
UHV GIS equipment need to be done the lightning impulse test when leaves the factory, which can check the problems in the process of manufacturing, assembling, etc.
论述了特高压GIS设备在出厂检验时需要作雷电冲击试验,能有效检查制造、装配工艺等环节出现的问题。
This pa-per introduces thick film assembling technique, equipment, technical parameters and testing methods while narrating the manufacturing process of thick film circuits.
在叙述点火模块厚膜电路的生产过程中系统介绍了厚膜封装工艺、相关设备、技术参数和检测方法。
应用推荐