as-built drawings 竣工图 ; 竣工图纸 ; 竣工图则
highway as built drawings 道路竣工图
as-built drawings and documentation 竣工图纸资料
As-built drawings shall be submitted within 60 days after the Start-up tests are completed.
竣工图应在启动测试完成后的60天内呈递给所有人。
This further elaboration of the deliverables is captured in as-built drawings, and final operating adjustments are made during testing and turnover.
这些特征的逐步完善最终都反映在竣工图中。在检测和移交阶段,通常还以最终运行调整的形式进一步完善这些特征。
Check up with built-in pipe& hole& so on as per drawings during civil construction.
依据图纸设计检查土建的予埋件预留空洞。