Roark, knowing that the project is under Toohey's control, and that a plan under his own name would never be accepted, agrees, on the condition that his plan be built precisely as designed.
罗克,明知那个项目在图希的控制之下,也知道冠以他的名字的设计不会被任何人接受,于是同意设计这个项目,前提是他的方案必须准确的按设计图纸建造。
But the 2030 plan demands more infrastructure, such as DAMS, pipelines, and irrigation systems, be built to bring water closer to people, she says.
她说,《2030远景规划》要求新建更多基础设施,如水库、管线和灌溉系统,以缩短人们的用水距离。
Baishi Reservior, located on upstream of Daling River close to Sshangyuanxi Village in Beipiao, Liaoning, has been built as a key project in Phase I Development Plan in Daling drainage.
白石水库位于辽宁省北票市上园乡附近的大凌河干流上,是大凌河流域第一期开发的控制性骨干工程,水库建成后,将产生许多环境工程地质问题。
应用推荐