Using this technology can save working times of crane and reduce workers to pipe well with centralized arrangement pipe and electric engineering with narrow working platform.
采用该工艺对于管道集中布置的管井及现场施工作业面狭窄的高层建筑的机电工程施工,可节省塔吊作业时间并减少现场作业人员数量。
Reduced air pipe and valve must be foreseen into the Cargo Pump Room. The position and arrangement will be determined together.
必须提前考虑在泵舱布置压缩空气管及服务阀门,位置及布置将由双方共同决定。
This thesis makes every effort to find a feasible method to solve the problem of the heating pipe network while the overall arrangement optimizing and the parameter optimizing.
本论文力求找到一套可行的方法来解决城市集中供热管网的布局优化和参数优化这一类通用问题。
应用推荐