The major drawback to this cloud is the difficulty in effectively creating and governing such a solution.
该云的主要缺陷是很难有效创建和管理此类解决方案。
The article introduces the fabrication process of 350mw steam turbine outer cylinder, and describes the solution to every difficulty in detail.
介绍了350 MW汽轮机低压外缸的制造过程,并对各个制造难点的解决作了详细的说明。
The parameters, structure, design difficulty, solution and test data of 900MVA on-load-tap-changing auto transformer are introduced.
介绍了900MVA自耦有载调压变压器的基本参数、基本结构、设计难点、解决方案及试验结果。
应用推荐