Shifting time from anchorage to unloading berth, time lost due to berthing operations and preparations by the vessel to berth, and time taken for completion of pratique at anchorage or after berthing.
从锚地到卸货泊位的移泊时间,由于靠泊操作和船只准备靠泊而损失的时间以及在锚地或靠泊后为办完入港许可而花费的时间。
Due to the influence of the weight and anchorage zone of the side span splay casting, unloaded cable shape is the shape with splay casting weight.
因边跨散索套重量及锚固区设置影响,主缆空缆线形即为有散索套重量下的空缆线形。
If the vessel is compelled to wait for berth due to any reason, N/R shall be tendered upon the vessel's arrival at anchorage point for the DISCHARGE Point.
如果因任何原因,船只必须等待靠泊,应在船只到达卸货地锚地后发出备妥通知。