Considering the critical components like reactor coolant lines and oil-well casings, the metal parts are subjected to prior replacement, for safety, with respect to a worst-case analysis of failure.
考虑到关键部件如反应堆冷却剂线和油井涂层不能出现问题,为了安全,并对失效做了最坏的分析,这类金属零件会得到优先更换。
The new method is applied the safety analysis for energetics binder of high energy propellant and success is achieved.
并采用所建立的方法对高能推进剂的含能粘合剂的安全性进行了分析,获得了可应用的结果。
Proper analysis on the hydraulic transient in pressure pipeline is important for the safety operation of project.
有压管道水力瞬变的正确分析,对工程安全运行影响较大。
应用推荐