Air preheater a of Unit 5 boiler in Shajiao 'a' Power Plant experienced a secondary combustion during Standby. As a result, the air preheater was damaged seriously.
沙角发电总厂A厂5号炉a空气预热器(以下简称“空预器”)在停炉期间发生二次燃烧,造成该空预器严重损坏。
In the end, based on electricity, the calculating methods for the cost and benefit of heating and electricity are studied, which are applied to air-cooled unit of BaoTou Second Thermal Power Plant.
最后,以电量法为基础,研究了热电联产热、电产品的成本效益计算方法,并将其应用于包头二热空冷机组的成本效益分析中。
To ensure the normally operation of broadcasting studios, retrofitting old air handling unit plant rooms is made.
为保证广播电台演播室的正常工作,对原有的空调机房进行了改造。
应用推荐