The type-conversion cost of the resource-type cities can be divided into the adjustment cost and the delay cost.
资源型城市转型成本可以分为调整成本和延误成本。
The power generation strategies with minimized adjustment cost of the generating sets and its mathematical model are proposed.
文中提出了机组调节成本最小化的发电策略及其数学模型。
The adjustment cost minus the delay cost is the net cost of the type-conversion, and the adjustment cost plus the delay cost is the total cost of the type-conversion.
调整成本减去延误成本为转型的净成本;调整成本加上延误成本为转型的总成本。
应用推荐